Most migrations are tested, but far fewer are reconciled: proved, object by object, to hold the same data and produce the same numbers as the old system. This framework is the structure we use for ERP and data platform migrations. Copy it, adapt the tolerances to your organisation, and automate as much of it as you can.
The five levels of reconciliation
| Level | What it proves | Typical checks |
|---|---|---|
| 1. Completeness | Everything that should move did move | Record counts per object, per load and per legal entity; missing and extra keys |
| 2. Accuracy of values | Amounts and quantities are unchanged | Sums of amounts and quantities by key grouping; hash totals |
| 3. Mapping | Codes landed where they were meant to | Old-to-new code mapping coverage; unmapped and many-to-one exceptions |
| 4. Financial balances | The books still balance | Trial balance by period, entity and account; sub-ledger to ledger; open items |
| 5. Report equivalence | Users will see the same answers | Key management reports run on old and new and compared line by line |
Levels 1 to 3 catch technical errors early. Levels 4 and 5 are what finance and auditors sign.
Define the rules before testing
For every migrated object, write one line in a reconciliation register:
- Object (for example open supplier invoices).
- Measure (count, sum of open amount in transaction currency).
- Grain (legal entity and supplier).
- Tolerance: usually zero for financial balances, and documented if not.
- Owner who signs off, and the evidence they need.
Agreeing this before the first trial load avoids arguments about what “matches” means a week before cutover.
Automate it
Reconciliation that lives in spreadsheets gets skipped when time runs short. A better pattern, which we build in Microsoft Fabric:
- Land source extracts and target extracts for each trial load in a lakehouse.
- Run reconciliation rules as code, in a notebook or SQL, writing one result row per rule, object and load.
- Keep every run, so improvements across trial loads are visible.
- Show results in a Power BI reconciliation dashboard, with pass and fail by object and drill-down to the differing records.
- Export the evidence pack for sign-off from the same data.
The same results table pattern is used in our data quality monitoring demo.
Explaining differences
Every exception needs a cause and a decision. Common causes include:
- Cut-off: transactions posted after the extract was taken.
- Mapping: codes merged or split between old and new structures.
- Filters: inactive, closed or zero-value records excluded on one side.
- Currency and rounding: different conversion rates or rounding rules.
- Duplicates: loads re-run without clearing previous data.
- Genuine source data errors, which should be fixed at source, not adjusted in the migration.
The sign-off pack
For each object: the rule, the final run result, explained exceptions, and the owner's sign-off with a date. Together with the mapping documents, this is the audit trail for the migration. It is also what lets users stop running the old reports.
For a worked ERP example, see Agresso to Oracle Fusion: data quality before you migrate, and for Dynamics 365, the D365 F&O reporting architecture guide.
Need independent migration assurance?
We design and run reconciliation alongside your ERP or platform partner.
Comments are closed