Power BI for Manufacturing

Manufacturers rarely lack data. They lack one version of it. We build Power BI and Microsoft Fabric reporting that connects production, inventory, costing and finance from your ERP, so variance, yield and stock problems are visible during the month, not after it closes.

Production varianceYield & scrapInventory & stockERP-connected
Manufacturing reporting demo: output vs plan, production variance, yield and scrap, and inventory from Dynamics 365 through Microsoft Fabric.

Manufacturing reporting that operations and finance both trust

Production and work orders

Output against plan, line efficiency, on-time completion and work order status by site, line and product.

Production variance

Standard versus actual cost, split into material price, usage, labour and overhead variances by site, line and product.

Yield, scrap and quality

Yield percentages, scrap cost by line and reason, write-offs and quality holds.

Inventory and stock

Stock value, days cover, stock turns, ageing, expiry risk and slow-moving stock.

Stock adjustments

Inventory journals by reason, site and user, so unexplained adjustments are challenged before month end.

Sales, margin and debtors

Revenue and margin by customer, channel and product, plus aged debtors and DSO.

Manufacturing KPI cards in Power BI - revenue, gross margin, output cases, yield, production variance and inventory value
Manufacturing KPIs: output, yield and production variance against plan.

See the D365 manufacturing demo

The Dynamics 365 F&O manufacturing reporting demo walks through an eight-page Power BI report for a food manufacturer: production, variance, yield, stock, adjustments and debtors, with data delivered through Fabric Link.

Yield and scrap dashboard in Power BI - scrap cost by production line, yield trend vs target and write-offs by reason code
Yield, scrap and quality by line and product.
Cost of production bridge in Power BI - standard cost to actual cost through material price, usage and scrap, labour and overhead variances
Cost of production bridge from standard to actual cost.

ERP and data sources

  • Microsoft Dynamics 365 Finance and Operations and Supply Chain Management, via Fabric Link
  • Dynamics 365 Business Central, SAP, Sage and other manufacturing ERPs
  • MES, line and SCADA exports for machine and line data
  • Warehouse, logistics and delivery tracking platforms
  • Excel plans, budgets and standard costs

Experience in manufacturing and food production

For a national food manufacturer we moved Dynamics 365 Finance and Operations reporting from an Azure data warehouse to a Microsoft Fabric Warehouse via Fabric Link, and built Power BI reporting for stock transactions, stock adjustments, work orders and production variances for the bakery division, alongside aged debtors for finance. We have also built reporting for heavy engineering, utilities and logistics businesses.

Related demos: D365 production cost variance, inventory value and GL reconciliation and sales margin and OTIF.

Ways to work with us

Project or fixed scope

A defined deliverable and price, agreed before work starts. See pricing.

Hire a contractor direct

A senior contractor inside your team on a day rate, without agency markup. Hire direct or see who you would work with.

Consultancies and Microsoft partners

White-label or named subcontracting for your projects. See partner delivery support.

Manufacturing reporting FAQs

Can Power BI report on production variance?

Yes. With standard and actual costs from your ERP, Power BI can show total production variance and split it into material price, usage, labour and overhead by site, line, product and period.

Do you work with Dynamics 365 for manufacturing?

Yes. We work with Dynamics 365 Finance and Operations and Supply Chain Management data using Fabric Link, which replaced Export to Data Lake.

Can we track OEE in Power BI?

Yes, if availability, performance and quality data is captured, typically from MES or line systems. Where it is not, we start with yield, efficiency and downtime data you already have.

How do you handle multiple sites?

A shared model with site-level security, consistent definitions and the ability to compare sites on the same basis.

How long does a first manufacturing dashboard take?

A first release covering one area, such as production variance or inventory, is typically weeks, built on foundations that later areas reuse.

See variance and stock problems before month end

Book a call to discuss your ERP and production reporting.

Book a discovery call

Name