Moving to Microsoft Fabric is rarely a lift-and-shift. We migrate Azure Synapse, SQL Server, data lake and Power BI Premium workloads into Fabric, prove the numbers match before cutover, and size the capacity so the first invoice is not a surprise.
What we migrate
Azure Synapse Analytics
Dedicated SQL pools to a Fabric Warehouse, Spark pools and notebooks to Fabric Spark, and Synapse pipelines to Data Factory in Fabric. We decide object by object what moves as-is, what is rewritten and what is retired.
SQL Server and on-premises data warehouses
SQL Server, SSIS packages and stored-procedure ETL moved into a lakehouse or warehouse, using the on-premises data gateway or mirroring where it fits, with the history you need and none of the clutter.
Data lakes and Databricks
ADLS Gen2 data surfaced through OneLake shortcuts instead of copied, and Delta tables reused where possible. Where Databricks stays, we design how it and Fabric share data rather than forcing a migration.
Power BI Premium capacity
Microsoft is moving Power BI Premium per-capacity (P SKU) customers to Fabric (F SKU) capacities, usually at renewal. We map workspaces, size the F SKU from real usage and move without breaking reports or apps.
How a Fabric migration runs
- Inventory. Every source object, pipeline, model and report, with owners, usage and refresh schedules. Unused objects are flagged for retirement, not migrated.
- Target design. Lakehouse or warehouse per layer, workspaces, security, naming and the medallion pattern (Bronze, Silver, Gold) that suits your team's skills.
- Capacity sizing. Estimated capacity units from current workloads, checked against the Fabric Capacity Metrics app during the pilot.
- Pilot. One subject area end to end, from source to report, to prove performance, security and cost before the rest moves.
- Migrate and reconcile. Each table and measure is reconciled to the old platform with agreed tolerances, and differences are explained before sign-off.
- Cutover and decommission. Parallel run, switch-over of reports and apps, then shut-down of the old platform so you stop paying twice.
Where Fabric migrations go wrong
- Moving everything. Most estates carry objects nobody uses. Migrating them adds cost and testing for no value.
- No reconciliation plan. If nobody can prove the new totals match the old ones, users keep the old reports running in parallel indefinitely.
- Under-sized or over-sized capacity. Throttling on day one, or paying for a capacity twice the size you need.
- Security as an afterthought. Workspace roles, OneLake security and row-level security need designing, not copying.
- One-to-one rewrites. A Synapse pattern copied into Fabric without using shortcuts, Direct Lake or Fabric pipelines misses most of the benefit.
Experience behind the approach
Tomasz Kuler has led data platform work across Azure Synapse, Azure Databricks and Microsoft Fabric. That includes a data transition team through a major UK retailer's IT separation and a Fabric lakehouse built from scratch for a cancer research institute moving ERP platforms. Client names stay confidential. The Dynamics 365 to Fabric demo shows the reconciliation approach on public demo data.
Ways to work with us
Project or fixed scope
A defined deliverable and price, agreed before work starts. See pricing.
Hire a contractor direct
A senior contractor inside your team on a day rate, without agency markup. Hire direct or see who you would work with.
Consultancies and Microsoft partners
White-label or named subcontracting for your projects. See partner delivery support.
Microsoft Fabric migration FAQs
How long does a migration to Microsoft Fabric take?
It depends on the number of sources, objects and reports. A focused pilot of one subject area typically takes a few weeks; the full plan and estimate come out of the inventory, before you commit to the rest.
Do we have to move off Azure Synapse?
Not immediately. Synapse remains supported, but Microsoft's new investment is going into Fabric. We help you decide what to move now, what to leave, and what to retire.
What happens to our Power BI reports?
Reports and semantic models are repointed to the new sources and tested against the old figures. Where it helps performance and cost, models move to Direct Lake.
How do you size the Fabric capacity?
From the measured load of your current workloads, then confirmed with the Capacity Metrics app during the pilot. See our capacity optimisation service.
Can you work alongside our Microsoft partner?
Yes. We regularly support consultancies as named or white-label delivery capacity. See partner delivery support.
Related: Data platform migration · Data migration reconciliation · Microsoft Fabric architecture review · Microsoft Fabric implementation.
Planning a move to Microsoft Fabric?
Start with an inventory and a costed migration plan. You will get a proposal within 48 hours.