A good contractor interview for Power BI or Microsoft Fabric takes about an hour: 45 minutes of conversation and a short review of something you already have. That tells you more than a CV, a certification list or an unpaid take-home build. This guide gives you the structure, the questions, what good answers sound like, and the warning signs.
Decide what you are hiring for first
Most poor contractor hires come from an unclear brief, not a weak candidate. Before you interview, write down three things:
- Build, fix or lead. A new Fabric lakehouse, a rescue of slow or wrong reports, or technical leadership over an internal team need different people.
- The data sources. Dynamics 365, SAP, Oracle, Sage, Xero, a CRM or flat files. ERP finance data needs someone who understands ledgers, dimensions and reconciliation, not just visuals.
- Who supports it afterwards. If your team will own the result, handover and documentation matter as much as the build.
If you are unsure which kind of engagement you need, the contractor vs consultancy vs permanent hire comparison sets out the trade-offs and costs.
A one-hour interview structure
| Part | Time | What you learn |
|---|---|---|
| Their most relevant project, told by them | 10 min | Whether they did the work or managed it, and how they talk about trade-offs |
| Technical questions on your stack | 20 min | Depth in data modelling, DAX, Fabric and your source systems |
| Review of one of your reports or models (screen share) | 15 min | How they diagnose problems on real material, and how they explain them |
| Ways of working and handover | 10 min | Documentation, version control, deployment, and how they leave things |
| Their questions for you | 5 min | Good contractors ask about data quality, users and who signs off |
Questions that separate senior contractors
Ask open questions about decisions, not definitions. Anyone can recite what a star schema is; fewer people can explain when they broke the rule and why.
Data modelling
Ask: “Walk me through the semantic model behind a finance report you built. What were the fact tables and why?”
Good answers mention grain, conformed dimensions such as date, account and legal entity, why they avoided bi-directional relationships, and how they handled things like budget vs actual at different grains.
DAX and performance
Ask: “A report page takes 20 seconds to load. What do you check, in what order?”
Good answers start with Performance Analyzer and the model, not the visuals: cardinality, unnecessary columns, iterator-heavy measures, storage mode, and DAX Studio or query plans for the slow queries.
Microsoft Fabric
Ask: “When would you use a lakehouse, a warehouse, or Direct Lake vs Import?”
Good answers are conditional: they depend on the team’s skills (Spark vs SQL), data volumes, refresh needs and capacity size, and they mention the fallback behaviour and limits of Direct Lake.
ERP and source data
Ask: “How do you prove the numbers in Power BI match the ledger?”
Good answers describe reconciliation to trial balance or source totals, agreed tolerances, a named owner who signs off, and automated checks after each load.
Governance and deployment
Ask: “How do changes get from development to the report users see?”
Good answers mention separate workspaces, deployment pipelines or Git integration, row-level security testing, and who approves a release.
Handover
Ask: “What will my team have on the day you leave?”
Good answers are specific: a model diagram, measure definitions, refresh and failure runbook, and a walkthrough session recorded for later.
Use a short review, not an unpaid build
Take-home tasks that ask a contractor to build something for free put off the most experienced people, who have other offers. A better test is 15 minutes on a screen share reviewing one of your existing reports or models. Ask them what they would change first and why. You learn how they think on real material, and you get a few useful observations for free without asking for unpaid work.
Warning signs
- Talks only about visuals and colours, never the model or the data.
- Cannot describe a decision they got wrong and what they changed.
- Says every problem needs a full rebuild before looking at what you have.
- Vague about who actually did the work on “their” projects.
- No view on documentation or handover.
- Promises a fixed delivery date before seeing your data.
After the interview
Ask for one reference from a technical lead or finance owner who used the work, not only a project manager. Agree the scope, deliverables and notice in writing. If your organisation is medium or large, you also need to assess the role under the off-payroll rules: see the IR35 checklist for Power BI and Fabric contracts.
Want to interview a senior Fabric and Power BI contractor directly?
See who you would work with, compare agency and direct costs, or send a brief through the contractor enquiry form. Availability is confirmed per enquiry, with a proposal within 48 hours.
Comments are closed