Use this checklist to plan a Microsoft Fabric implementation or to check one already under way. It is grouped by stage and written from delivery experience, not product marketing. Each item is a decision or a test that, if skipped, usually comes back as cost, rework or a loss of trust in the numbers.
1. Scope and ownership
Before any build
- The first use case is named, with the decision it supports and the people who will use it.
- A business owner signs off definitions and numbers; a technical owner owns the platform.
- Sources, volumes, refresh frequency and history requirements are listed per subject area.
- Success is measurable: report adopted, manual hours saved, numbers reconciled.
- What is out of scope for phase one is written down.
2. Capacity and licensing
Capacity
- An F SKU is chosen from estimated load, with a plan to measure it in the pilot using the Fabric Capacity Metrics app.
- Development and production are separated, or a reason is recorded for sharing.
- Non-production capacity is paused outside working hours where possible.
- Report consumers' licensing is confirmed (Pro, Premium Per User or capacity-based viewing).
- A capacity admin and an alert on sustained high usage are in place.
3. Workspaces, domains and lifecycle
Structure
- Workspaces separate layers (for example ingestion, transformation, reporting) and environments (dev, test, prod).
- Domains group workspaces by business area where you have more than a handful.
- Git integration is set up for supported items, and a branching approach is agreed.
- Deployment pipelines or an equivalent process move changes to production.
- Naming conventions for workspaces, lakehouses, tables, pipelines and models are written down.
4. Security and governance
Access
- Workspace roles are assigned to groups, not individuals.
- OneLake data access and item permissions are designed for each layer.
- Row-level security is designed in the semantic model and tested with real user accounts.
- Sensitivity labels are applied where data is confidential, and export behaviour is understood.
- Endorsement (promoted, certified) is used so users know which content to trust.
- Guest access, sharing and export settings in the Fabric admin portal are reviewed.
5. Data architecture
Lakehouse and warehouse
- Lakehouse vs warehouse is chosen per layer based on team skills (Spark or SQL) and workload.
- Medallion layers have clear rules: Bronze raw, Silver cleaned and conformed, Gold modelled for reporting.
- Shortcuts are used to reference data where copying adds no value.
- Each table has a defined grain, keys and history method (overwrite, append, slowly changing).
- Large tables load incrementally, with a watermark or change data feed.
- Delta table maintenance (optimise, vacuum) is scheduled.
6. Pipelines and data quality
Loads
- Each pipeline has error handling, retries and alerts to a named person.
- A load log records start, end, row counts and status for every run.
- Data quality rules run after loading, with results stored and reported. See data quality reporting in Fabric.
- Source system changes, such as new columns or renamed fields, are detected rather than silently breaking loads.
- Secrets and connections use managed identities or a vault, not personal accounts.
7. Semantic models and reports
Models
- Direct Lake, Import or DirectQuery is chosen per model, with fallback behaviour understood.
- Shared semantic models serve many reports, instead of one model per report.
- Measures are defined once, named consistently and documented.
- A date table, conformed dimensions and role-playing dates are in place.
- Report pages are tested with Performance Analyzer on realistic data.
8. Testing and reconciliation
Prove the numbers
- Key totals reconcile to the source system (for finance, the trial balance by period and entity).
- Tolerances and sign-off owners are agreed per measure.
- Security is tested by viewing as real roles.
- A parallel run compares old and new reports before switching. See the reconciliation framework.
9. Go-live and handover
Run it
- A runbook covers refresh schedules, failure handling and who to call.
- Documentation includes a model diagram, measure definitions and data lineage.
- Users are trained on the reports they will actually use.
- Capacity usage is reviewed in the first weeks after go-live.
- A backlog and review cadence exist for phase two.
Using this checklist
For a new implementation, use it as a plan. For an existing estate, mark each item as done, partly done or missing, and fix the missing items that affect cost, security or trust first. If you would like an independent view, the Microsoft Fabric architecture review follows the same structure, and the implementation cost guide explains what drives budget.
Sources
Planning or rescuing a Fabric implementation?
Get a senior review against this checklist, as a fixed-scope project, a direct contractor or partner support.
Comments are closed